BACKGROUND

Construction of a 33KV substation complete with 2 No Transformer bays.
The site is positioned adjacent to the entrance to an exclusive housing estate and therefore was designed and built to look like the houses on the estate, not a typical substation.

SCOPE OF WORKS

  • Tree Removal.
  • Piled Foundation.
  • Concrete Substructure complete with cable trenches and ducts.
  • Natural Stone Construction.
  • Upvc Windows.
  • Hardwood Doors.
  • Drainage including sewer connection.
  • Construction of carpark and access road.
  • Metal and Timber perimeter fencing.
  • Soft and Hard Landscaping.

     
 